Mentor

T.-C. Shen

Document Type

Report

Publication Date

4-2019

First Page

1

Last Page

4

Abstract

I approached Dr. Shen with a desire for a project in understanding how to manage and expand the capabilities of a laboratory. After some discussion, my senior project was to complete a gas and water chiller system to an existing furnace for chemical vapor deposition. It should be able to handle temperatures up to 1100 ºC, hold a vacuum to mTorr, be easy to move samples in and out of the furnace, and cost effective.

Included in

Physics Commons

Share

COinS