Location

Virtual

Start Date

7-5-2021 12:00 AM

End Date

7-8-2021 12:00 AM

Description

A method is developed to generate bank-full river main channel geometry, to complement an open-source Digital Elevation Model (DEM) and produce a calibrated hydraulic model reproducing the extent of historically observed overbank flooding. This approach relies on limited surveyed cross section and flow rate information and is potentially suitable for projects in developing countries where the availability of measured data is limited. The method presented is applied to the case of the seasonal flooding of the Baro River in the Gambela floodplain in Ethiopia, modelled with a two-dimensional hydraulic model. The simulated flooding extent for the 1990 wet season is compared with the observed flooding from 1990 satellite imagery and the expected flow interaction patterns with the near Alwero River, showing good agreement. The calibrated model is also used to show the impact of the planned TAMS hydropower dam on the Baro River flooding.

Share

COinS
 
Jul 5th, 12:00 AM Jul 8th, 12:00 AM

Calibration of a Hydraulic Model for Seasonal Flooding in a Lowland River with Natural Diversions and Bathymetric Uncertainty, for Dam Downstream Impact Assessment

Virtual

A method is developed to generate bank-full river main channel geometry, to complement an open-source Digital Elevation Model (DEM) and produce a calibrated hydraulic model reproducing the extent of historically observed overbank flooding. This approach relies on limited surveyed cross section and flow rate information and is potentially suitable for projects in developing countries where the availability of measured data is limited. The method presented is applied to the case of the seasonal flooding of the Baro River in the Gambela floodplain in Ethiopia, modelled with a two-dimensional hydraulic model. The simulated flooding extent for the 1990 wet season is compared with the observed flooding from 1990 satellite imagery and the expected flow interaction patterns with the near Alwero River, showing good agreement. The calibrated model is also used to show the impact of the planned TAMS hydropower dam on the Baro River flooding.

 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.