Document Type
Other
Publisher
Department of Biological and Irrigation Engineering, Utah State University
Publication Date
2-1997
Abstract
TCE/PCE contaminated groundwater from March AFB has reached off-base supply wells. Further migration of the contaminants can endanger other downstream water supply wells.
Recommended Citation
Hegazy, M.A. and R.C. Peralta. 1997. Feasiblity Considerations of an Optimal Pumping Strategy to Capture TCE/PCE Plume at March AFB, CA. Prepared for Earth Technology Corporation. Report SS/OL 97-1 Systems Simulation/Optimization Laboratory, Dept. of Biological and Irrigation Engineering, Utah State University, Logan, UT, 41 p.