All Current Publications

Document Type

Other

Publisher

Utah State University Extension

Publication Date

6-23-2022

First Page

1

Last Page

2

Abstract

The cost of building a high tunnel fluctuates over time with supply prices. This Excel workbook accompanies the USU Extension fact sheet, "Constructing a Low-cost High Tunnel" by Black, Drost, Rowley, and Heflebower (2011) and allows users to input local supply costs. The workbook then calculates the cost to build a USU low-cost high tunnel with several design options according to high tunnel length and door structure. It also provides an example calculation based on April 2022 pricing for reference.

Share

COinS