Document Type

Report

Publication Date

6-1986

Abstract

This report describes the basic procedures and references more detailed documents for the operation of meteorological and air quality sensing instrumentation, data depiction and analysis systems for an incinerator pilot plant located at the Tooele Army Depot site near Salt Lake City, Utah. It discusses the site topography and climatology, sensor configuration, calibration, quality assurance and data reporting procedures for the monitoring system and demonstrates their compliance with applicable environmental regulations of United States Federal Government and the State of Utah.

Comments

UCRL--15876 DE87 006726

Share

COinS