On January 22, 1990, Ariane V-35 placed four Microsat spacecraft into orbit. The orbit achieved is nearly perfectly sun synchronous at 800 km altitude. The satellites, cubic structures measuring only 23 cm per side, were developed by the Radio Amateur Satellite Corporation of North America (AMSAT-NA). The time required to complete the project, from conception to delivery of the four satellites to Kourou, was exactly two years. Each satellite in orbit has a different mission and is performing in accordance with its intended design, although additional software is still being written to enhance the operating characteristics for each mission. This paper reviews the design objectives of the four spacecraft and summarizes their in-orbit performance against these prelaunch technical objectives. The level of technology employed by the Microsat spacecraft is briefly discussed and the software approach taken in implementing a real-time, multitasking operating system is summarized. The paper reviews the AMSAT experience as the first payload user group of the Ariane ASAP structure. Some of the findings regarding the current technology and how it may be expanded to fulfill other mission needs has been touched upon.

Share

COinS
 
Aug 29th, 9:30 AM

The In-Orbit Performance of Four Microsat Spacecraft

On January 22, 1990, Ariane V-35 placed four Microsat spacecraft into orbit. The orbit achieved is nearly perfectly sun synchronous at 800 km altitude. The satellites, cubic structures measuring only 23 cm per side, were developed by the Radio Amateur Satellite Corporation of North America (AMSAT-NA). The time required to complete the project, from conception to delivery of the four satellites to Kourou, was exactly two years. Each satellite in orbit has a different mission and is performing in accordance with its intended design, although additional software is still being written to enhance the operating characteristics for each mission. This paper reviews the design objectives of the four spacecraft and summarizes their in-orbit performance against these prelaunch technical objectives. The level of technology employed by the Microsat spacecraft is briefly discussed and the software approach taken in implementing a real-time, multitasking operating system is summarized. The paper reviews the AMSAT experience as the first payload user group of the Ariane ASAP structure. Some of the findings regarding the current technology and how it may be expanded to fulfill other mission needs has been touched upon.