Session

Technical Poster Session 12: Systems

Location

Utah State University, Logan, UT

Abstract

The Japan Aerospace Exploration Agency (JAXA) has selected on-orbit demonstration missions for the Innovative Satellite Technology Demonstration-3 project in May 2020, as part of the Innovative Satellite Technology Demonstration Program. Seven on-orbit demonstration missions were selected in a category of " parts, components and subsystems" and those missions will be demonstrated onboard the RApid Innovative payload demonstration SatellitE-3 (RAISE-3). This 100kg-class satellite developed by JAXA is a flagship of the "Innovative Satellite Technology Demonstration-3" fleet. This paper describes an overview of the demonstration missions and system specifications of RAISE-3, as well as results of conceptual design of the satellite and a partial application of digital development process to an initial phase of the project. Further, project plan and technical challenges to be studied in a project implementation phase are also discussed.

SSC21-P1-20 (1).pdf (1086 kB)
Article

Share

COinS
 
Aug 7th, 12:00 AM

RAISE-3 for Agile On-Orbit Demonstration of Innovative Satellite Technologies: Mission Definition and Conceptual Design

Utah State University, Logan, UT

The Japan Aerospace Exploration Agency (JAXA) has selected on-orbit demonstration missions for the Innovative Satellite Technology Demonstration-3 project in May 2020, as part of the Innovative Satellite Technology Demonstration Program. Seven on-orbit demonstration missions were selected in a category of " parts, components and subsystems" and those missions will be demonstrated onboard the RApid Innovative payload demonstration SatellitE-3 (RAISE-3). This 100kg-class satellite developed by JAXA is a flagship of the "Innovative Satellite Technology Demonstration-3" fleet. This paper describes an overview of the demonstration missions and system specifications of RAISE-3, as well as results of conceptual design of the satellite and a partial application of digital development process to an initial phase of the project. Further, project plan and technical challenges to be studied in a project implementation phase are also discussed.