Session
Weekend Session 2: Recent Launches - Research & Academia
Location
Utah State University, Logan, UT
Abstract
The Binar Space Program is a recently formed space research and education group part of the Space Science and Technology Center at Curtin University in Western Australia. Recently launching the first CubeSat from the state, Binar-1, the team is making steps towards creating a sustainable mission schedule for research and education. The Binar-1 mission primary objective was to demonstrate the custom designed systems made by PhD students and engineers at the university. The main technology being demonstrated was the integrated Binar CubeSat Core, which compacted the Electrical Power System, Attitude Determination and Control System, and flight computer system into 0.25U. Alongside this, the team also aimed to learn about end-to-end spacecraft mission design and engage with the public to build an understanding of the importance of space industry and research in the country. Binar-1 was deployed from the International Space Station on the 6th of October 2021, and initially was silent for 15 days until the Binar team was able to make contact by enabling a secondary beacon. This paper will present the Binar-1 mission including the custom design, operations, failure analysis, and results before finally summarizing the lessons learned by the team while flying Western Australia’s first space capability.
Binar Space Program: Binar-1 Results and Lessons Learned
Utah State University, Logan, UT
The Binar Space Program is a recently formed space research and education group part of the Space Science and Technology Center at Curtin University in Western Australia. Recently launching the first CubeSat from the state, Binar-1, the team is making steps towards creating a sustainable mission schedule for research and education. The Binar-1 mission primary objective was to demonstrate the custom designed systems made by PhD students and engineers at the university. The main technology being demonstrated was the integrated Binar CubeSat Core, which compacted the Electrical Power System, Attitude Determination and Control System, and flight computer system into 0.25U. Alongside this, the team also aimed to learn about end-to-end spacecraft mission design and engage with the public to build an understanding of the importance of space industry and research in the country. Binar-1 was deployed from the International Space Station on the 6th of October 2021, and initially was silent for 15 days until the Binar team was able to make contact by enabling a secondary beacon. This paper will present the Binar-1 mission including the custom design, operations, failure analysis, and results before finally summarizing the lessons learned by the team while flying Western Australia’s first space capability.