We present the power system development of the 2U CubeSat, AGU Remote Innovative CubeSat Alert system -2(ARICA-2). The main goal of the ARICA-2 project is to demonstrate the real-time alert system of transient astronomical sources using commercial satellite network devices. 1U CubeSat ARICA was launched in November 2021. However, we have not been able to send and receive the data at this point. Therefore, we started developing 2U CubeSat ARICA-2, which is an improved version of ARICA, in April 2022. One of the possible causes of the communication problem of ARICA is the power system, such as a negative power budget or a failure in the installation of the inhibit switches. ARICA-2 is upsized from 1U to 2U to ensure a sufficient power generation and is equipped with improved inhibit switches. The calculation of power consumption and simulation of power supply on orbit have been finished. We confirmed the performance of our Electric Power System (EPS) and the health of the installed batteries. We are currently in the EM development phase with the goal of launching in Japanese fiscal year 2024.

Share

COinS
 
Aug 6th, 10:15 AM

Power System Development of the AGU Remote Innovative CubeSat Alert System -2 – ARICA-2

Utah State University, Logan, UT

We present the power system development of the 2U CubeSat, AGU Remote Innovative CubeSat Alert system -2(ARICA-2). The main goal of the ARICA-2 project is to demonstrate the real-time alert system of transient astronomical sources using commercial satellite network devices. 1U CubeSat ARICA was launched in November 2021. However, we have not been able to send and receive the data at this point. Therefore, we started developing 2U CubeSat ARICA-2, which is an improved version of ARICA, in April 2022. One of the possible causes of the communication problem of ARICA is the power system, such as a negative power budget or a failure in the installation of the inhibit switches. ARICA-2 is upsized from 1U to 2U to ensure a sufficient power generation and is equipped with improved inhibit switches. The calculation of power consumption and simulation of power supply on orbit have been finished. We confirmed the performance of our Electric Power System (EPS) and the health of the installed batteries. We are currently in the EM development phase with the goal of launching in Japanese fiscal year 2024.