Session

Poster Session 1

Location

Salt Palace Convention Center, Salt Lake City, UT

Abstract

Flight software teams iterate quickly in development and then slow down at integration, because the software must be validated against real hardware that is itself still changing. 

Bench testing is manual, intermittent, and happens late. Defects surface days after the commit that caused them, once the context is gone and the change has been built on.

Document Type

Event

Share

COinS
 
Aug 23rd, 12:00 AM

F Prime to Flight Faster: Hardware-in-the-Loop Continuous Integration for Accelerated CubeSat Development

Salt Palace Convention Center, Salt Lake City, UT

Flight software teams iterate quickly in development and then slow down at integration, because the software must be validated against real hardware that is itself still changing. 

Bench testing is manual, intermittent, and happens late. Defects surface days after the commit that caused them, once the context is gone and the change has been built on.