Document Type

Full Issue

Publication Date

5-1935

Abstract

Project 90-A Study of Factors Influencing the Financial Condition of Certain Utah Irrigation and Drainage Projects-was undertaken in 1928 as an intensified study of local areas. This study was divided among four departments, with a project leader for each particular phase of the study. These four project leaders, guided by the Station Director, have constituted a committee in immediate charge of this project. Subprojects and their respective leaders are: A-Engineering and Engineering Economic Aspects, O. W. Israelsen; B-Soil Productivity Aspects , D. S. Jennings; C- Contributing Sociological Aspects, J. A. Geddes; and D-Economic Aspects, W. Preston Thomas.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.