Document Type

Poster

Journal/Book Title/Conference

College of Engineering Senior Design Projects

Publisher

Utah State University

Location

Logan, UT

Publication Date

2020

Abstract

The purpose of the Dry Canyon Well project is to provide an additional water supply to Smithfield City. Smithfield City anticipates a 100% increase in population over the next 40 years. To accommodate the future demand, Smithfield City hired T&S Engineers to design a well. T&S Engineers designed the chlorination system, pump house, pipeline to a nearby storage tank, and gravel road to access the well.

Share

COinS