Files

Download

Download Full Text (571 KB)

Description

On Wednesday, representatives from the U.S. Army Corps of Engineers design and construction team for the Lake Isabella Dam Restoration Project visited the UWRL for another look at the large 1:45 scale model of the planned labyrinth weir spillway modifications the Corps commissioned UWRL researchers to construct in the UWRL hydraulics laboratory so they could test their designs.

Publisher

Utah State University

Publication Date

9-2-2016

Keywords

Utah Water Research Laboratory, UWRL, news

Disciplines

Hydrology

Lake Isabella Dam USACE Team Returns to the UWRL

Included in

Hydrology Commons

Share

COinS