Document Type

Report

Publication Date

January 1969

Abstract

A discussion of telemetering system modifications is given, and discussion is presented of system operations for the 1968-69 snow season. A telemetering error analysis has been made for an operational period in February. A log is presented giving station operation periods, and a general summary of operational costs for the 1968-69 operational year is summarized.

Share

COinS