Document Type

Other

Publisher

Utah State University

Publication Date

3-2024

First Page

1

Last Page

1

Abstract

Page 5 – Major Finding 6 (change also made in text on Page 18):

Added “in the reported pipe inventory” to better clarify the percentage reduction

Page 6 – Major Finding 14 (change also made in text on Page 31):

Changed “six” to “five” years to explain the time elapsed between the 2018 and 2023 studies

Page 7 – Major Finding 28 (change also made in text on Page 46):

Added “percentage” to better clarify the percentage of acceptance

Page 8 – Section 1.1:

Updated “(WRF, 2017)” to “(Grigg, 2007)” and “(US Conference of Mayors, 2018)” to “(Anderson, 2018)”

Page 25 – Figure 22:

Added “in the basic survey” to the note

Page 30 – Figure 29:

Reversed the bars so that “12-months” appears before “Five Years”

Page 44 – Section 7.0:

Replaced “construction-related failure rate” with “construction-related failures” since “rate” was incorrect

Page 51 – References:

Updated “Water Research Foundation, “Asset Management: Breaks & Leaks,” 2017.” to “Grigg, N.S., “Main Break Prediction, Prevention, and Control,” Water Research Foundation, 2007.”

Share

COinS